-
... (Object) stdClass
-
vid (String, 6 characters ) 385072
-
uid (String, 3 characters ) 125
-
title (String, 35 characters ) Misicuni y Semapa no acaban ductos
-
log (String, 0 characters )
-
status (String, 1 characters ) 1
-
comment (String, 1 characters ) 1
-
promote (String, 1 characters ) 0
-
sticky (String, 1 characters ) 0
-
nid (String, 6 characters ) 385072
-
type (String, 7 characters ) noticia
-
language (String, 2 characters ) es
-
created (String, 10 characters ) 1501301879
-
changed (String, 10 characters ) 1501301879
-
tnid (String, 1 characters ) 0
-
translate (String, 1 characters ) 0
-
revision_timestamp (String, 10 characters ) 1501301879
-
revision_uid (String, 3 characters ) 125
-
body (Array, 1 element)
-
und (Array, 1 element)
-
0 (Array, 5 elements)
-
value (String, 3340 characters ) <p> A 17 días del plazo para el inicio de las...
-
<p> A 17 días del plazo para el inicio de las pruebas del sistema de la represa de Misicuni que dotará de agua a la hidroeléctrica de la Empresa Nacional de Electricidad (ENDE) y a la ciudad, los trabajos en los ductos continúan en el tramo de la Empresa Misicuni y en el sector de Semapa están paralizados, según un recorrido realizado ayer.</p> <p> La Empresa Misicuni recién comenzó con el movimiento de tierras para terminar 35 metros de tubería de 1.400 milímetros. Este tramo es importante para hacer la conexión de la hidroeléctrica a la planta de Misicuni y al nuevo ducto de 12,7 kilómetros de Semapa.</p> <p> El Servicio Municipal de Agua Potable (Semapa) aún no retomó los trabajos en la conexión de las tuberías en las quebradas de los ríos K’ora y Tolavi de 30 metros.</p> <p> La tubería es esencial para transportar 500 litros por segundo (l/s) de la represa desde el 15 de agosto para mejorar la dotación de agua en la ciudad.</p> <p> “Las obras que Semapa y Misicuni tienen pendiente concluir son muy delicadas, por lo que los trabajos podrían concluir a fines de agosto”, afirmó ayer el presidente de la Asociación de Ingenieros Eméritos (Aiseme), Gonzalo Maldonado.</p> <p> El gerente de Semapa, Gamal Serhan, prefirió no informar sobre la fecha de conclusión de los trabajos, porque acordó con ENDE y Misicuni no brindar información al respecto a la prensa.</p> <p> “Vamos a arrancar las pruebas en agosto, no le puedo decir nada más, vamos a hacer todas las pruebas necesarias. No le puede dar más detalles hemos acordado eso con ENDE y Misicuni, para evitar justamente este tipo de problemas”, declaró.</p> <p> ENDE, Misicuni y Semapa se reunieron por primera vez el lunes 24 de julio para coordinar las pruebas desde el 15 de agosto.</p> <p> La asambleísta departamental, Lizeth Beramendi, lamentó que el Concejo Municipal de Cercado no haga un seguimiento de la construcción del ducto de Semapa e indicó que Alvarado se presentará el 3 de agosto ante la Asamblea Departamental para brindar un informe.</p> <p> Maldonado dijo que mientras no se completen el tendido de los tramos faltantes no se pueden realizar las pruebas. “La población seguirá con racionamiento hasta septiembre”, opinó.</p> <p> Cercado dejó de recibir agua del plan inmediato el 24 de julio; los 300 l/s que ya no llegan se compensan con las reservas de la represa de Escalerani.</p> <p> </p> <p> <strong>OPINIONES </strong></p> <p> <strong>Lizeth Beramendi, asambleísta</strong></p> <p> Parece que las tres empresas se han reunido para ponerse de acuerdo cómo van a ocultar el retraso que tienen en la ejecución de sus ductos y cómo van a disimular el perjuicio a la ciudad (por la demora en la entrega de agua), porque ninguna ha terminado las obras y no se pueden hacer las pruebas con agua.</p> <p> <strong>Gonzalo Maldonado, Asieme</strong></p> <p> La población todavía va a sufrir dificultades (abastecimiento de agua), por lo menos, hasta el mes de septiembre, cuando recién se terminen las obras de Semapa y Misicuni. Entretanto, va a haber desabastecimiento, ya la población está sufriendo porque recibe la mitad de lo que recibía y hay problemas en todas las zonas de Cochabamba.</p>
-
-
summary (String, 0 characters )
-
format (String, 9 characters ) full_html
-
safe_value (String, 3270 characters ) <p> A 17 días del plazo para el inicio de las ...
-
<p> A 17 días del plazo para el inicio de las pruebas del sistema de la represa de Misicuni que dotará de agua a la hidroeléctrica de la Empresa Nacional de Electricidad (ENDE) y a la ciudad, los trabajos en los ductos continúan en el tramo de la Empresa Misicuni y en el sector de Semapa están paralizados, según un recorrido realizado ayer.</p> <p> La Empresa Misicuni recién comenzó con el movimiento de tierras para terminar 35 metros de tubería de 1.400 milímetros. Este tramo es importante para hacer la conexión de la hidroeléctrica a la planta de Misicuni y al nuevo ducto de 12,7 kilómetros de Semapa.</p> <p> El Servicio Municipal de Agua Potable (Semapa) aún no retomó los trabajos en la conexión de las tuberías en las quebradas de los ríos K’ora y Tolavi de 30 metros.</p> <p> La tubería es esencial para transportar 500 litros por segundo (l/s) de la represa desde el 15 de agosto para mejorar la dotación de agua en la ciudad.</p> <p> “Las obras que Semapa y Misicuni tienen pendiente concluir son muy delicadas, por lo que los trabajos podrían concluir a fines de agosto”, afirmó ayer el presidente de la Asociación de Ingenieros Eméritos (Aiseme), Gonzalo Maldonado.</p> <p> El gerente de Semapa, Gamal Serhan, prefirió no informar sobre la fecha de conclusión de los trabajos, porque acordó con ENDE y Misicuni no brindar información al respecto a la prensa.</p> <p> “Vamos a arrancar las pruebas en agosto, no le puedo decir nada más, vamos a hacer todas las pruebas necesarias. No le puede dar más detalles hemos acordado eso con ENDE y Misicuni, para evitar justamente este tipo de problemas”, declaró.</p> <p> ENDE, Misicuni y Semapa se reunieron por primera vez el lunes 24 de julio para coordinar las pruebas desde el 15 de agosto.</p> <p> La asambleísta departamental, Lizeth Beramendi, lamentó que el Concejo Municipal de Cercado no haga un seguimiento de la construcción del ducto de Semapa e indicó que Alvarado se presentará el 3 de agosto ante la Asamblea Departamental para brindar un informe.</p> <p> Maldonado dijo que mientras no se completen el tendido de los tramos faltantes no se pueden realizar las pruebas. “La población seguirá con racionamiento hasta septiembre”, opinó.</p> <p> Cercado dejó de recibir agua del plan inmediato el 24 de julio; los 300 l/s que ya no llegan se compensan con las reservas de la represa de Escalerani.</p> <p> </p> <p> <strong>OPINIONES </strong></p> <p> <strong>Lizeth Beramendi, asambleísta</strong></p> <p> Parece que las tres empresas se han reunido para ponerse de acuerdo cómo van a ocultar el retraso que tienen en la ejecución de sus ductos y cómo van a disimular el perjuicio a la ciudad (por la demora en la entrega de agua), porque ninguna ha terminado las obras y no se pueden hacer las pruebas con agua.</p> <p> <strong>Gonzalo Maldonado, Asieme</strong></p> <p> La población todavía va a sufrir dificultades (abastecimiento de agua), por lo menos, hasta el mes de septiembre, cuando recién se terminen las obras de Semapa y Misicuni. Entretanto, va a haber desabastecimiento, ya la población está sufriendo porque recibe la mitad de lo que recibía y hay problemas en todas las zonas de Cochabamba.</p>
-
-
safe_summary (String, 0 characters )
-
-
-
-
opencalais_city_tags (Array, 0 elements)
-
opencalais_country_tags (Array, 0 elements)
-
opencalais_person_tags (Array, 0 elements)
-
field_noticia_sumario (Array, 1 element)
-
und (Array, 1 element)
-
0 (Array, 3 elements)
-
value (String, 189 characters ) A 17 días del plazo para el inicio de las prueb...
-
A 17 días del plazo para el inicio de las pruebas del sistema de la represa de Misicuni que dotará de agua a la hidroeléctrica de la Empresa Nacional de Electricidad (ENDE) y a la ciudad
-
-
format (NULL)
-
safe_value (String, 189 characters ) A 17 días del plazo para el inicio de las prueb...
-
A 17 días del plazo para el inicio de las pruebas del sistema de la represa de Misicuni que dotará de agua a la hidroeléctrica de la Empresa Nacional de Electricidad (ENDE) y a la ciudad
-
-
-
-
-
field_noticia_seccion (Array, 1 element)
-
field_noticia_tags (Array, 0 elements)
-
field_noticias_relacionadas (Array, 0 elements)
-
field_noticia_fecha (Array, 1 element)
-
field_autor (Array, 1 element)
-
field_noticia_firma (Array, 0 elements)
-
field_noticia_fuente (Array, 1 element)
-
field_noticia_fotos (Array, 1 element)
-
und (Array, 4 elements)
-
0 (Array, 17 elements)
-
fid (String, 6 characters ) 312592
-
uid (String, 3 characters ) 125
-
filename (String, 8 characters ) Misicuni
-
uri (String, 58 characters ) public://media_imagen/2017/7/29/1_b1_mauricio_r...
-
public://media_imagen/2017/7/29/1_b1_mauricio_rocabado.jpg
-
-
filemime (String, 10 characters ) image/jpeg
-
filesize (String, 6 characters ) 139031
-
status (String, 1 characters ) 1
-
timestamp (String, 10 characters ) 1501301786
-
type (String, 5 characters ) image
-
field_file_image_description (Array, 1 element)
-
und (Array, 1 element)
-
0 (Array, 3 elements)
-
value (String, 82 characters ) Trabajos de excavación en el tramo entre ENDE y...
-
Trabajos de excavación en el tramo entre ENDE y la planta de la Empresa Misicuni.
-
-
format (NULL)
-
safe_value (String, 82 characters ) Trabajos de excavación en el tramo entre ENDE y...
-
Trabajos de excavación en el tramo entre ENDE y la planta de la Empresa Misicuni.
-
-
-
-
-
field_file_image_credits (Array, 1 element)
-
und (Array, 1 element)
-
0 (Array, 3 elements)
-
value (String, 17 characters ) Mauricio Rocabado
-
format (NULL)
-
safe_value (String, 17 characters ) Mauricio Rocabado
-
-
-
-
rdf_mapping (Array, 0 elements)
-
metadata (Array, 2 elements)
-
height (String, 3 characters ) 430
-
width (String, 3 characters ) 770
-
alt (NULL)
-
title (NULL)
-
-
1 (Array, 17 elements)
-
fid (String, 6 characters ) 312593
-
uid (String, 3 characters ) 125
-
filename (String, 12 characters ) Río K’ora
-
uri (String, 58 characters ) public://media_imagen/2017/7/29/2_b1_mauricio_r...
-
public://media_imagen/2017/7/29/2_b1_mauricio_rocabado.jpg
-
-
filemime (String, 10 characters ) image/jpeg
-
filesize (String, 6 characters ) 140943
-
status (String, 1 characters ) 1
-
timestamp (String, 10 characters ) 1501301818
-
type (String, 5 characters ) image
-
field_file_image_description (Array, 1 element)
-
und (Array, 1 element)
-
0 (Array, 3 elements)
-
value (String, 53 characters ) El río K’ora, donde las obras están paralizadas...
-
El río K’ora, donde las obras están paralizadas.
-
-
format (NULL)
-
safe_value (String, 53 characters ) El río K’ora, donde las obras están paralizadas...
-
El río K’ora, donde las obras están paralizadas.
-
-
-
-
-
field_file_image_credits (Array, 1 element)
-
und (Array, 1 element)
-
0 (Array, 3 elements)
-
value (String, 17 characters ) Mauricio Rocabado
-
format (NULL)
-
safe_value (String, 17 characters ) Mauricio Rocabado
-
-
-
-
rdf_mapping (Array, 0 elements)
-
metadata (Array, 2 elements)
-
height (String, 3 characters ) 430
-
width (String, 3 characters ) 770
-
alt (NULL)
-
title (NULL)
-
-
2 (Array, 17 elements)
-
fid (String, 6 characters ) 312594
-
uid (String, 3 characters ) 125
-
filename (String, 4 characters ) Ende
-
uri (String, 58 characters ) public://media_imagen/2017/7/29/3_b1_mauricio_r...
-
public://media_imagen/2017/7/29/3_b1_mauricio_rocabado.jpg
-
-
filemime (String, 10 characters ) image/jpeg
-
filesize (String, 5 characters ) 82900
-
status (String, 1 characters ) 1
-
timestamp (String, 10 characters ) 1501301845
-
type (String, 5 characters ) image
-
field_file_image_description (Array, 1 element)
-
und (Array, 1 element)
-
0 (Array, 3 elements)
-
value (String, 53 characters ) La casa de máquinas de ENDE, en Joverancho, El ...
-
La casa de máquinas de ENDE, en Joverancho, El Paso.
-
-
format (NULL)
-
safe_value (String, 53 characters ) La casa de máquinas de ENDE, en Joverancho, El ...
-
La casa de máquinas de ENDE, en Joverancho, El Paso.
-
-
-
-
-
field_file_image_credits (Array, 1 element)
-
und (Array, 1 element)
-
0 (Array, 3 elements)
-
value (String, 17 characters ) Mauricio Rocabado
-
format (NULL)
-
safe_value (String, 17 characters ) Mauricio Rocabado
-
-
-
-
rdf_mapping (Array, 0 elements)
-
metadata (Array, 2 elements)
-
height (String, 3 characters ) 430
-
width (String, 3 characters ) 770
-
alt (NULL)
-
title (NULL)
-
-
3 (Array, 17 elements)
-
fid (String, 6 characters ) 312595
-
uid (String, 3 characters ) 125
-
filename (String, 15 characters ) Tubería Semapa
-
uri (String, 58 characters ) public://media_imagen/2017/7/29/4_b1_mauricio_r...
-
public://media_imagen/2017/7/29/4_b1_mauricio_rocabado.jpg
-
-
filemime (String, 10 characters ) image/jpeg
-
filesize (String, 6 characters ) 127114
-
status (String, 1 characters ) 1
-
timestamp (String, 10 characters ) 1501301870
-
type (String, 5 characters ) image
-
field_file_image_description (Array, 1 element)
-
und (Array, 1 element)
-
0 (Array, 3 elements)
-
value (String, 40 characters ) Una antigua tubería de agua de Semapa.
-
format (NULL)
-
safe_value (String, 40 characters ) Una antigua tubería de agua de Semapa.
-
-
-
-
field_file_image_credits (Array, 1 element)
-
und (Array, 1 element)
-
0 (Array, 3 elements)
-
value (String, 17 characters ) Mauricio Rocabado
-
format (NULL)
-
safe_value (String, 17 characters ) Mauricio Rocabado
-
-
-
-
rdf_mapping (Array, 0 elements)
-
metadata (Array, 2 elements)
-
height (String, 3 characters ) 430
-
width (String, 3 characters ) 770
-
alt (NULL)
-
title (NULL)
-
-
-
-
field_noticia_video (Array, 0 elements)
-
field_noticia_pdf (Array, 0 elements)
-
field_noticia_audio (Array, 0 elements)
-
field_noticia_html (Array, 0 elements)
-
field_noticia_titulo_portada (Array, 0 elements)
-
field_noticia_id_df (Array, 0 elements)
-
field_noticia_equipo (Array, 0 elements)
-
field_noticia_especial (Array, 0 elements)
-
opencalais_organization_tags (Array, 0 elements)
-
field_noticia_subhome (Array, 1 element)
-
field_noticia_pos_subhome (Array, 1 element)
-
field_noticia_count_face (Array, 1 element)
-
field_noticia_count_twitter (Array, 1 element)
-
field_noticia_count_social_total (Array, 1 element)
-
field_noticia_fecha_simple (Array, 1 element)
-
field_noticia_mult_principal (Array, 1 element)
-
field_noticia_publicacion (Array, 1 element)
-
field_noticia_sec_import (Array, 0 elements)
-
field_noticia_id_import (Array, 0 elements)
-
field_noticia_url_import (Array, 0 elements)
-
field_noticia_count_whatsapp (Array, 1 element)
-
field_noticia_count_view (Array, 1 element)
-
field_cocha18_noticia_deporte (Array, 0 elements)
-
rdf_mapping (Array, 9 elements)
-
rdftype (Array, 2 elements)
-
title (Array, 1 element)
-
predicates (Array, 1 element)
-
0 (String, 8 characters ) dc:title
-
-
-
created (Array, 3 elements)
-
predicates (Array, 2 elements)
-
datatype (String, 12 characters ) xsd:dateTime
-
callback (String, 12 characters ) date_iso8601 | (Callback) date_iso8601();
-
-
changed (Array, 3 elements)
-
predicates (Array, 1 element)
-
0 (String, 11 characters ) dc:modified
-
-
datatype (String, 12 characters ) xsd:dateTime
-
callback (String, 12 characters ) date_iso8601 | (Callback) date_iso8601();
-
-
body (Array, 1 element)
-
predicates (Array, 1 element)
-
0 (String, 15 characters ) content:encoded
-
-
-
uid (Array, 2 elements)
-
predicates (Array, 1 element)
-
0 (String, 16 characters ) sioc:has_creator
-
-
type (String, 3 characters ) rel
-
-
name (Array, 1 element)
-
predicates (Array, 1 element)
-
0 (String, 9 characters ) foaf:name
-
-
-
comment_count (Array, 2 elements)
-
predicates (Array, 1 element)
-
0 (String, 16 characters ) sioc:num_replies
-
-
datatype (String, 11 characters ) xsd:integer
-
-
last_activity (Array, 3 elements)
-
predicates (Array, 1 element)
-
0 (String, 23 characters ) sioc:last_activity_date
-
-
datatype (String, 12 characters ) xsd:dateTime
-
callback (String, 12 characters ) date_iso8601 | (Callback) date_iso8601();
-
-
-
path (Array, 1 element)
-
pathauto (String, 1 characters ) 1
-
-
cid (String, 1 characters ) 0
-
last_comment_timestamp (String, 10 characters ) 1501301879
-
last_comment_name (NULL)
-
last_comment_uid (String, 3 characters ) 125
-
comment_count (String, 1 characters ) 0
-
name (String, 7 characters ) loreoli
-
picture (String, 1 characters ) 0
-
data (String, 218 characters ) a:7:{s:16:"ckeditor_default";s:1:"t";s:20:"cked...
-
a:7:{s:16:"ckeditor_default";s:1:"t";s:20:"ckeditor_show_toggle";s:1:"t";s:14:"ckeditor_width";s:4:"100%";s:13:"ckeditor_lang";s:2:"en";s:18:"ckeditor_auto_lang";s:1:"t";s:7:"contact";i:1;s:17:"mimemail_textonly";i:0;}
-
-
-
Krumo version 0.2.1a
| http://krumo.sourceforge.net/var/www/vhosts/www.lostiempos.com/drupal/includes/menu.inc
, line527
-
Krumo version 0.2.1a
| http://krumo.sourceforge.net/var/www/vhosts/www.lostiempos.com/drupal/includes/menu.inc
, line527